POWER PLANT BOILER HOUSE

Location:

Elbląg

Number of posts:

90

Scanning time:

8h

Miejscowość:

Ilość stanowisk:

90

Czas skanowania:

8h

During this implementation, laser scanning was carried out in the boiler room of the power plant. The scope of work included the steam pipeline and the slings that support the installation. The measurements were taken to measure the resulting displacement of the slings in relation to a point cloud created after the installation of the pipeline.